Capital Improvement Projects in the Public Works Department include Major Road, Minor Road Improvements, Trails, Sidewalks & Stormwater Projects (under the Engineering Division), Signals & Traffic Safety Projects (Traffic Engineering Division) and Road Paving & Pavement Rehabilitation (Road Operation and Stormwater Division).

Use a map of Seminole County or 'My Resident Information' to find out which Commissioner District you are located in.

FILTER WHAT TO VIEW

COMMISSIONER DISTRICT: 
PROJECT TYPE:
PROJECTS STARTING WITH:

Printer-Friendly VersionPrinter-friendly List of All Projects

Go to page: 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12

PROJECT ID
PROJECT  [Expand All - Close All]
01785287
WEATHERSFLD/LITTLE WEK BRIDGE

Project Type: Bridge Repair
Project Manager: Sam Moussa
Status: Completed
From: WEATHERSFIELD AVE
To: @LITTLE WEKIVA
Scope: THIS PROJECT WILL INSPECT BRIDGE AND FOLLOW-UP WITH EITHER BRIDGE REHABILITATION OR REPLACEMENT
Phases:

  Design                          Start: 10/2019 End: 9/2021
  Construction                    Start: -    End: -

01785376
WEKIVA BASIN TMDL

Project Type: Stormwater
Project Manager: Kimberly Ornberg - 407-665-2012
Status: Active
Scope: STUDY IN PROGRESS ON THIS BASIN, THIS PROJECT WILL BE PHASE 2 OF THE BASIN STUDY
Phases:

  Design                          Start: -    End: -
  Construction                    Start: -    End: -

01907067
WEKIVA SPRINGS RD DRAINAGE IMPROV / FEMA-HMGP

Project Type: Rehabilitation
Project Manager:
Status: Unfunded
Scope: WEKIVA SPRINGS ROAD CULVERTS AND WEIR-SWEETWATER CREEK AREA / RANKING FLHZ-14 FLOODING ANALYSIS, CROSS PIPE, ROAD REPLACEMENT AND RAISING ROAD PROFILE /PROPOSED AS FEMA-HMGP 75%/COUNTY 25%/ UP FRONT FUNDING WITH REIMBURSEMENT THE SCOPE OF THE PROJECT INCLUDES ENGINEERING DESIGN ANALYSIS, PERMITTING, PLANS PREPARATION AND CONSTRUCTION OF THE PROPOSED IMPROVEMENTS. THE FOLLOWING ARE THE BREAKDOWN OF THE ESTIMATED PROJECT COST: ENGINEERING ANALYSIS-ESTIMATED COST=$160,000.00 (MODEL UPDATE OF THE BASIN, THIS CREEK COVERS A DRAINAGE BASIN AREA OF @ 1.8 SQUARE MILES; BASIN MODEL IS VERY OLD; OTHER TASK INCLUDE DATA COLLECTION SUCH AS SURVEY, OLD STUDIES, AS BUILT PLANS & OTHERS); PERMITTING & PLANS-ESTIMATED COST=$140,000.00 (ROADWAY PROFILE UPDATE, STRUCTURE DESIGN, PEDESTRIAN BRIDGE RELOCATION, UTILITY ADJUSTMENT, PUBLIC INFORMATION & OTHERS); CONSTRUCTION COST=$775,000.00 (4-53"X83"RCP, PED BRIDGE RELOCATION, PAVEMENT, FILL); CEI COST=$100,000.00 (CONSTRUCTION ENGINEERING INSPECTION)

02007027
WEKIVA SPRINGS RD INT IMPS

Project Type: Roadway Projects
Project Manager: Angela Cardona
Status: Active
Scope: CONVERT THE WB RIGHT TURN LANE TO A WB THROUGH LANE, FROM EAST OF SABAL PALM DRIVE TO JUST WEST OF FOX VALLEY DRIVE,; ADD A SECOND EB THROUGH LANE FROM S. SWEETWATER BOULEVARD TO JUST EAST OF FOX VALLEY DRIVE. PROJECT CAME ABOUT PER A SAFETY STUDY PREVIOUSLY COMPLETED. $300,000 BUDGETED FOR FY 19/20.
Phases:

  Design                          Start: -    End: -
  Construction                    Start: -    End: -

01785173
WEKIVA SPRINGS ROAD FIBER UPGRADE

Project Type: Traffic
Project Manager: Charles Wetzel III
Status: Completed
From: SR 434
To: FIRE STATION 16
Scope: UPGRADE ALONG WEKIVA SPRINGS ROAD. UPGRADE FROM AERIAL TO UNDERGROUND SR 434 TO FIRE STATION 16. UPGRADE THE FIBER CABLE ON THIS LINK FOR INCREASED CAPACITY AND EFFICIENCY. FIBER PROVIDES COMMUNICATIONS FOR SIGNAL AND ITS EQUIPMENT, AS WELL AS BANDWIDTH FOR DATA AND PHONE SERVICE FOR OTHER COUNTY DEPARTMENTS AND PAYING FWAN CUSTOMERS.
Phases:

  Construction                    Start: -    End: -

02107099
WHITCOMB DR DRAINAGE PROJECT

Project Type: Stormwater
Project Manager: Tuan Huynh
Status: Active
From: SOUTH OF LAKE HARNEY RD
To: SOUTH OF CROSSOVER LN
Scope: BASED ON RECOMMENDATIONS FROM THE LAKE HARNEY BASIN STUDY, WHITCOMB DR DRAINAGE PROJECT WILL BE DESIGNED TO ALLEVIATE ROADWAY FLOODING IN THE AREA. THIS PROJECT IS ON WHITCOMB DR, SOUTH OF LK HARNEY RD TO SOUTH OF CROSSOVER LN. THIS PROJECT WILL RAISE THE ROADWAY ELEVATION AND EXPAND EXISTING ROADSIDE DITCHES INCREASING DRIVEWAY CULVERTS CAPACITY AND WILL PROVIDE A NEW OUTFALL TO LK HARNEY
Phases:

  Design                          Start: -    End: -
  Land                            Start: -    End: -
  Construction                    Start: -    End: -

02007154
WILLOW AVE DRAINAGE-HMGP GRANT

Project Type: Rehabilitation
Project Manager: Tuan Huynh
Status: Active
Scope:
Phases:

  Design                          Start: -    End: -

02007124
WILLOW AVE-ALHAMBRA DRAIN HMGP

Project Type: Stormwater
Project Manager: Tuan Huynh
Status: Active
Scope: FOREST SLOPES SUBDIVISION/LAKE HARRIET ESTATES, GPS COORDINATES - 28.670, -81.424 OR CLOSEST ADDRESS 105 SAGE STREET, ALTAMONTE SPRINGS PLAN ON REPLACING EIGHT (8) EXISTING CULVERTS WITH 5' X 3' CBCS AND ELEVATE ROADWAY TO ALLEVIATE LOCALIZED FLOODING, ALONG WITH EROSION CONTROL.
Phases:

  Design                          Start: -    End: -
  Construction                    Start: -    End: -

01785569
WILSON'S LANDING BIORETENTION

Project Type: Stormwater
Project Manager: Kimberly Ornberg - 407-665-2012
Status: Active
Scope: CONSTRUCTION RETROFIT TO SAFELY CONVEY RUNOFF INTO A BIORETENTION AREA PRIOR TO DISCHARGE INTO THE WEKIVA RIVER. PARTIALLY FUNDED BY 2014 SALES TAX, LEISURE SERVICES FUNDS AND GRANTS IN EQUAL PARTS.
Phases:

  Construction                    Start: -    End: -

02207097
WOODLAND II SUBDIV/OUTFALL STRUCTURES REPLACEMENT

Project Type: Stormwater
Project Manager:
Status: Active
Scope: WOODLAND II SUBDIV/OUTFALL STRUCTURES REPLACEMENT
Phases:

  Construction                    Start: -    End: -

00014601
WYMORE RD IMPROVEMENTS

Project Type: Roadway Projects
Project Manager: Angela Cardona
Status: Active
From: ORANGE COUNTY LINE
To: SR 436
Scope: THIS PROJECT CONSISTS OF RECONSTRUCTING THE EXISTING TWO LANE ROAD. THE RECONSTRUCTION WILL WIDEN THE ROADWAY FROM ITS CURRENT TWO LANES BY ADDING A CENTER MEDIAN WITH TURN LANES AND OTHER SAFETY AND DRAINAGE IMPROVEMENTS. THIS PROJECT WILL ALSO INCLUDE SIDEWALKS AND BIKE LANES. THE PROJECT LENGTH IS 1.3 MILES.
Phases:

  Design                          Start: 8/2013 End: 12/2018
  Land                            Start: 7/2016 End: 4/2019
  Road Construction               Start: 8/2019 End: -

Go to page: 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12

Total Number of projects: 286