Capital Improvement Projects in the Public Works Department include Major Road, Minor Road Improvements, Trails, Sidewalks & Stormwater Projects (under the Engineering Division), Signals & Traffic Safety Projects (Traffic Engineering Division) and Road Paving & Pavement Rehabilitation (Road Operation and Stormwater Division).

Use a map of Seminole County or 'My Resident Information' to find out which Commissioner District you are located in.

FILTER WHAT TO VIEW

COMMISSIONER DISTRICT: 
PROJECT TYPE:
PROJECTS STARTING WITH:

Printer-Friendly VersionPrinter-friendly List of All Projects

Go to page: 1

PROJECT ID
PROJECT  [Expand All - Close All]
01785303
ORANGE BLVD (CR431) SAFETY

Project Type: Roadway Projects
Project Manager: Ch2m
Status: Active
From: W SR 46
To: MONROE ROAD (CR 15)
Scope: THIS PROJECT PROPOSES TO ADD BICYCLE PEDESTRIAN AND LANDSCAPE IMPROVMENTS WITH POSSIBLE TRAFFIC CALMING TO IMPROVE BIKE QLOSF. ALSO A RESUFACING PER TAX PLAN, SIDEWALK ENHANCEMENTS PER SEMINOLE TRAILS MASTER PLAN. A ROADWAY SAFETY PROJECT IS CURRENTLY IN DESIGN TO 3LANE ORLAND BLVD AS NEEDED PER TAX PLAN UNDER CIP1785303. COST ESTIMATE ASSUMES RESURFACING, RESTRIPPING AND SIDEWALK CONSTRUCTION IN EXISTING ROW.
Phases:

  Design                          Start: 3/2016 End: 1/2020
  Land                            Start: 6/2019 End: 1/2020
  Construction                    Start: 8/2020 End: -

Go to page: 1

Total Number of projects: 1

State ProjectsLooking for state roadway projects? Visit the Florida Department of Transportation's (FDOT) page or utilize the FDOT District 5 Interactive Mapping and Reporting Application.

Disclaimer: The projects are a work in progress. We strive to keep the maps and information accurate so that they may be useful, but due to numerous factors some items might not be up to date with the latest changes. If you have any questions or concerns, please contact us at (407) 665-5674.