Environmental Services


Sewer Connection Inspection Form

Sewer Connection Inspection requires a 72 hour advanced notice Monday through Thursday and between the hours of 8:00 AM and 2:00 PM or Fridays between 8:00 AM and 12:00 PM.

     
* Indicates Required Field

Project Name   *
 

Contractor Phone   *
 

Contractor Email   *
 

Subcontractor Phone   *
 

Engineer   *
 

Utility Permit   *
 

Right of Way Permit
 

MOT Index   *
 

811 Locate Ticket   *
 

County Inspector   *
 

Connection to:
 

Inspection Date Requested


Date Requested MUST BE 72 HOUR NOTICE   *
 

Time Requested   *
 

Contractor's Responsibilities


1. Install dewatering, sheeting, bracing or shoring (if required)

2. Coring the hole in the manhole or lift station

3. Lining of manhole if force main connection is made

4. Re-working the existing invert to accept new inflow

5. Lift station liner repair after invert connection

6. Backfilling & compaction of excavated area

7. Restoration as required